[2017 New] Lead2pass 2017 100% Valid 200-150 Dumps Guarantee 100% Pass 200-150 Certification Exam (81-90)

Lead2pass 2017 August New Cisco 200-150 Exam Dumps!

100% Free Download! 100% Pass Guaranteed!

Lead2pass is one of the leading exam preparation material providers. Its updated 200-150 braindumps in PDF can ensure most candidates pass the exam without too much effort. If you are struggling for the 200-150 exam, it will be a wise choice that get help from Lead2pass.

Following questions and answers are all new published by Cisco Official Exam Center: https://www.lead2pass.com/200-150.html

QUESTION 81
On which two components of a router can a copy of a running-configuration file be saved manually by an engineer for backup purposes? (Choose two.)

A.    NVRAM
B.    Flash
C.    ROM
D.    RAM
E.    DRAM

Continue reading

[2017 PDF&VCE] Pass 840-425 Exam By Training Lead2pass New VCE And PDF Dumps (121-140)

Lead2pass 2017 August New Cisco 840-425 Exam Dumps!

100% Free Download! 100% Pass Guaranteed!

I’m currently studying for Cisco exam 840-425. I do enjoy studying for exams. It’s hard, but it’s an excellent forcing function. I learn bits and pieces here and there now and then about this and that, but when I have an exam schedule for a set date, I have to study! And not only do I put in more hours, but I follow a more systematic approach. In this article, I’m going to share Lead2pass braindumps in case you too are studying and this method works for you.

Following questions and answers are all new published by Cisco Official Exam Center: https://www.lead2pass.com/840-425.html

QUESTION 121
Which option describes what extending requirements analysis allows you to do?

A.    expand the scope of your project
B.    give you more time to deliver on existing project commitments
C.    go beyond the initial core requirements, to the next level of need, while also adding in new capabilities and solutions
D.    speed up the procurement process for a cloud-based solution

Continue reading

[2017 PDF&VCE] Pass 840-425 Exam By Training Lead2pass New VCE And PDF Dumps (101-120)

Lead2pass 2017 August New Cisco 840-425 Exam Dumps!

100% Free Download! 100% Pass Guaranteed!

We are all well aware that a major problem in the IT industry is that there is a lack of quality study materials. Our exam preparation material provides you everything you will need to take a certification examination. Our Cisco 840-425 Exam will provide you with exam questions with verified answers that reflect the actual exam. These questions and answers provide you with the experience of taking the actual test. High quality and value for the 840-425 Exam. 100% guarantee to pass your Cisco 840-425 exam and get your Cisco certification.

Following questions and answers are all new published by Cisco Official Exam Center: https://www.lead2pass.com/840-425.html

QUESTION 101
Who are the two primary users of an implementation strategy? (Choose two.)

A.    the technical architect
B.    the leaders for training
C.    executive sponsor and steering committee
D.    the program leader responsible for achieving business results
E.    major work package owners

Continue reading

[2017 PDF&VCE] Pass 840-425 Exam By Training Lead2pass New VCE And PDF Dumps (81-100)

Lead2pass 2017 August New Cisco 840-425 Exam Dumps!

100% Free Download! 100% Pass Guaranteed!

Lead2pass 840-425 braindumps including the exam questions and the answer, completed by our senior IT lecturers and the Cisco product experts, include the current newest 840-425 exam questions.

Following questions and answers are all new published by Cisco Official Exam Center: https://www.lead2pass.com/840-425.html

QUESTION 81
Which statement is a characteristic of future state capabilities?

A.    They identify operating practices for a single department.
B.    They depict all of the requirements that a customer organization desires (best case).
C.    They convey the most important business elements that are needed to achieve goals in the future.
D.    They should define very detailed needs for the near-term and high-level needs for one or more years out. Continue reading

[2017 PDF&VCE] Pass 840-425 Exam By Training Lead2pass New VCE And PDF Dumps (61-80)

Lead2pass 2017 August New Cisco 840-425 Exam Dumps!

100% Free Download! 100% Pass Guaranteed!

Cisco New Released Exam 840-425 exam questions are now can be downloaded from Lead2pass! All questions and answers are the latest! 100% exam pass guarantee! Get this IT exam certification in a short time!

Following questions and answers are all new published by Cisco Official Exam Center: https://www.lead2pass.com/840-425.html

QUESTION 61
Which three benefits will the customer see when the partner creates a roadmap that aligns IT initiatives to their business? (Choose three.)

A.    Elevate the relevance of the IT department.
B.    Clear view of IT investments.
C.    Better alignment between business standard roadmap and IT.
D.    Revenue growth.
E.    Technology adoption.

Continue reading

[2017 PDF&VCE] Pass 840-425 Exam By Training Lead2pass New VCE And PDF Dumps (41-60)

Lead2pass 2017 August New Cisco 840-425 Exam Dumps!

100% Free Download! 100% Pass Guaranteed!

How to pass 840-425 exam easily? Are you struggling for the 840-425 exam? Good news, Lead2pass Cisco technical experts have collected all the questions and answers which are updated to cover the knowledge points and enhance candidates’ abilities. We offer the latest 840-425 PDF and VCE dumps with new version VCE player for free download, and the new 840-425 dump ensures your 840-425 exam 100% pass.

Following questions and answers are all new published by Cisco Official Exam Center: https://www.lead2pass.com/840-425.html

QUESTION 41
Which three options are recommendations to implement change management? (Choose three.)

A.    Involve real influencers that help create engagement and support change.
B.    Deliver and communicate real business benefits periodically.
C.    Consider change has been accepted when it becomes part of the day to day operations.
D.    Only deploy the solution when 100% of the stakeholders agree.
E.    Consider change has been accepted when the partner has signed off the project.

Continue reading

[2017 PDF&VCE] Pass 840-425 Exam By Training Lead2pass New VCE And PDF Dumps (21-40)

Lead2pass 2017 August New Cisco 840-425 Exam Dumps!

100% Free Download! 100% Pass Guaranteed!

We at Lead2pass are committed to help you clear your 840-425 certification test with high scores. The chances of you failing to clear your 840-425 test, after going through our comprehensive exam dumps is very bleak.

Following questions and answers are all new published by Cisco Official Exam Center: https://www.lead2pass.com/840-425.html

QUESTION 21
Which three options are actions to realize the benefits? (Choose three.)

A.    Progress should be measured once the solution is deployed.
B.    Should take into account the relationship with the stakeholder.
C.    Should focus on measurable results.
D.    May be based on assumptions and risks.
E.    Include actions on the way, plus those already identified.

Continue reading

[2017 PDF&VCE] Pass 840-425 Exam By Training Lead2pass New VCE And PDF Dumps (1-20)

Lead2pass 2017 August New Cisco 840-425 Exam Dumps!

100% Free Download! 100% Pass Guaranteed!

Lead2pass dumps for 840-425 exam are written to the highest standards of technical accuracy, provided by our certified subject matter experts and published authors for development. We guarantee the best quality and accuracy of our products. We hope you pass the exams successfully with our practice test. With our Cisco 840-425 dumps, you will pass your exam easily at the first attempt. You can also enjoy 365 days free update for your product.

Following questions and answers are all new published by Cisco Official Exam Center: https://www.lead2pass.com/840-425.html

QUESTION 1
Which LoB focuses primary on growth, profit, people, and cash assets?

A.    Sales
B.    Finance
C.    Senior Leadership
D.    Customer Services

Continue reading

[Lead2pass New] Lead2pass Offering New 300-175 Exam PDF And 300-175 Exam VCE Dumps For Free Downloading (101-120)

Lead2pass 2017 August New Cisco 300-175 Exam Dumps!

100% Free Download! 100% Pass Guaranteed!

In recent years, many people choose to take Cisco 300-175 certification exam which can make you get the Cisco certificate and that is the passport to get a better job and get promotions. How to prepare for Cisco 300-175 exam and get the certificate? Please refer to Cisco 300-175 exam questions and answers on Lead2pass.

Following questions and answers are all new published by Cisco Official Exam Center: https://www.lead2pass.com/300-175.html

QUESTION 101
Which three options are valid system classes for QoS in a Cisco UCS blade system? (Choose three.)

A.    platinum
B.    silver
C.    best effort
D.    voice
E.    high-priority
F.    FCoE
G.    drop eligible

Continue reading

[Lead2pass New] Lead2pass Offering New 300-175 Exam PDF And 300-175 Exam VCE Dumps For Free Downloading (61-80)

Lead2pass 2017 August New Cisco 300-175 Exam Dumps!

100% Free Download! 100% Pass Guaranteed!

Our PDF dumps of 300-175 exam is designed to ensure everything which you need to pass your exam successfully. At Lead2pass, we have a completely customer oriented policy. We invite the professionals who have rich experience and expert knowledge of the IT certification industry to guarantee the PDF details precisely and logically. Our customers’ time is a precious concern for us. This requires us to provide you the products that can be utilized most efficiently.

Following questions and answers are all new published by Cisco Official Exam Center: https://www.lead2pass.com/300-175.html

QUESTION 61
Which two elements are defined in a dynamic vNIC connection policy? (Choose two.)

A.    adapter policy
B.    QoS policy
C.    network control policy
D.    number of dynamic vNICs
E.    jumbo frame size

Continue reading

[Lead2pass New] Lead2pass Offering New 300-175 Exam PDF And 300-175 Exam VCE Dumps For Free Downloading (41-60)

Lead2pass 2017 August New Cisco 300-175 Exam Dumps!

100% Free Download! 100% Pass Guaranteed!

Good news, Lead2pass has updated the 300-175 exam dumps. With all the questions and answers in your hands, you will pass the Cisco 300-175 exam easily.

Following questions and answers are all new published by Cisco Official Exam Center: https://www.lead2pass.com/300-175.html

QUESTION 41
Drag and Drop Question
This question concerns the installation of a Cisco Unified Computing System blade server AC power supply. Drag the options on the left to the right side in the correct order when performing the installation. Note: Not all of the steps on the left will be used.

Continue reading

[Lead2pass New] Lead2pass Offering New 300-175 Exam PDF And 300-175 Exam VCE Dumps For Free Downloading (21-40)

Lead2pass 2017 August New Cisco 300-175 Exam Dumps!

100% Free Download! 100% Pass Guaranteed!

Pass 300-175 exam with the latest Lead2pass 300-175 dumps: Lead2pass 300-175 exam questions and answers in PDF are prepared by our experts. Moreover, they are based on the recommended syllabus that covering all the 300-175 exam objectives.

Following questions and answers are all new published by Cisco Official Exam Center: https://www.lead2pass.com/300-175.html

QUESTION 21
If there are four I/O module links from the Cisco Unified Computing System 5108 Blade Chassis to the Cisco Unified Computing System 6248UP Fabric Interconnect, which dynamic vNICs can be defined?

A.    9
B.    16
C.    24
D.    48
E.    54
F.    112

Answer: E

QUESTION 22
Which two of the listed BIOS options are required for VM-FEX in high performance mode? (Choose two.)

A.    RSS
B.    interrupt coherency
C.    virtualization technology
D.    cache validation
E.    ATS support

Answer: CE

QUESTION 23
When adding a VMware ESXi host to the Distributed Virtual Switch, what are two risks of migrating a VMNIC that is associated to vSwitch 0? (Choose two.)

A.    loss of access to the management IP interface
B.    duplicate IP address error
C.    duplicate MAC address error
D.    loss of VMware ESXi communication with VMware vCenter
E.    DVS port group will not appear in the VM network settings
F.    DVS port group will overwrite the port groups in vSwitch 0

Answer: AD

QUESTION 24
Which VMware ESXi 5.0 CLI command will validate PassThru interfaces when they are available?

A.    vem status -v
B.    vempassthru-v
C.    vemintf -v
D.    vemifconfig -v
E.    vempts -v

Answer: A

QUESTION 25
Which three items are supported operating systems of the Cisco VM-FEX universal passthrough? (Choose three.)

A.    Oracle Solaris 11
B.    Red Hat Enterprise Linux 6.0
C.    Microsoft Windows Server 2003 SP3
D.    Microsoft Windows Server 2008
E.    Ubuntu Server 12.2
F.    SLES 11

Answer: BDF

QUESTION 26
Which two VMware features must be turned off in the data center cluster for Cisco VM-FEX universal passthrough to operate? (Choose two.)

A.    VMCI
B.    DRS
C.    FT
D.    HA
E.    vMotion

Answer: AC

QUESTION 27
Which two VMware features will not allow an adapter to transition from Cisco VM-FEX standard mode to universal passthrough mode? (Choose two.)

A.    VM Snapshot
B.    Volume Shadow Copy
C.    Storage vMotion
D.    HA
E.    Resource Reservations

Answer: AC

QUESTION 28
Which of the following is true concerning Fibre Channel communications on a Cisco Unified Computing System?

A.    Each VSAN requires a dedicated VLAN to carry FCoE traffic.
B.    FCoE VLANs are created like Ethernet VLANs on Cisco Unified Computing System Manager.
C.    FCoE VLANs may overlap with Ethernet VLANs.
D.    Cisco Unified Computing System Manager supports a maximum of 128 active VSANs.

Answer: A

QUESTION 29
Which of the following are true concerning authentication within a Cisco Unified Computing System?

A.    Authentication domains are used to leverage individual authentication systems.
B.    You can create up to 64 authentication domains, each associated with a provider group and realm in
Cisco Unified Computing System Manager.
C.    At login, the user can select the authentication domain to be used.
D.    Cisco Unified Computing System supports LDAP or RADIUS for remote authentication.
E.    A locally authenticated user account is authenticated directly through the fabric interconnect.

Answer: E

QUESTION 30
Which of the following scenarios accurately demonstrate how the Cisco Unified Computing System ensures that a firmware upgrade is minimally disruptive to the data center unified fabric?

A.    If an I/O module is upgraded to a version that is incompatible with its fabric interconnect, the fabric
interconnect can automatically reactivate the I/O module to a compatible version.
B.    If components like server BIOS, HBA, and RAID controller firmware are unsuccessfully updated through
direct firmware updates, the update process will fall back to a host firmware package that is associated
with the service profile.
C.    If an update of the subordinate fabric interconnect leaves it in a nonusable state, the primary fabric
interconnect will automatically be updated to ensure that one fabric interconnect is running the most
recent firmware.
D.    After Cisco Unified Computing System Manager upgrades the subordinate node, only then is the active
management node automatically synchronized.

Answer: A

QUESTION 31
How many links are there between a second-generation IOM (Cisco UCS 2204 or 2208) and a third- generation half-width blade (Cisco UCS B200 M3 or B22 M3) in a Cisco UCS system?

A.    1
B.    2
C.    4
D.    8

Answer: C

QUESTION 32
Which policy would you change to form a port channel between a Cisco UCS 6248 and a Cisco UCS 2208?

A.    link aggregation policy
B.    chassis discovery policy
C.    IOM connection policy
D.    link discovery policy

Answer: B

QUESTION 33
The Cisco UCS 6200 Series Fabric Interconnects offer a new feature that allows dynamic port allocation for all of the 10 Gigabit Ethernet interfaces. What are these ports called?

A.    universal ports
B.    flex ports
C.    unified ports
D.    converged ports

Answer: C

QUESTION 34
In which situation would you be required to change a Cisco UCS system from end-host mode to switching mode?

A.    Design requirements call for the use of fabric failover.
B.    Fabric interconnect is connecting to disjoint Layer 2 networks upstream.
C.    HSRP routers are directly connected to the fabric interconnect.
D.    Upstream Cisco Nexus 5000 is configured for vPC.

Answer: C

QUESTION 35
Drag and Drop Question
Drag the characteristic on the left to the appropriate Cisco UCS adapter on the right, where the adapter supports that characterishtic.

 

Answer:

 

QUESTION 36
Drag and Drop Question
The Cisco Integrated Management Controller on a Cisco Unified Computing B-Series server provides a number of features. Drag the functionality on the left to the appropriate feature on the right.

 

Answer:

 

QUESTION 37
Drag and Drop Question
This questions concern the replacement of copper twinax SFP+transceiver with an optical SFP+transceiver on a Cisco Unified Computing System blade server. Drag the options on the left to the right side in the correct order when performing the replacement. Note: Not all of the options on the left will be used.

 

Answer:

 

QUESTION 38
Drag and Drop Question
This questions concerns the installation of a Cisco Unified Computing System 5108 fan module. Drag the options on the left to the right side in the correct order when performing the installation. Note:
Not all of the steps on the left will be used.

 

Answer:

 

QUESTION 39
Drag and Drop Question
This questions concerns the installation of a Cisco Unified Computing System blade server hard drive. Drag the options on the left to the right side in the correct order when performing the installation. Note: Not all of the steps on the left will be used.

 

Answer:

 

QUESTION 40
Drag and Drop Question
This question concerns the installation of a Cisco Unified Computing System blade server I/O module. Drag the options on the left to the right side in the correct order when performing the installation. Note: Not all of the steps on the left will be used.

 

Answer:

More free Lead2pass 300-175 exam new questions on Google Drive: https://drive.google.com/open?id=0B3Syig5i8gpDVDYyRldqb1AzenM

Comparing with others’, you will find our 300-175 exam questions are more helpful and precise since all the 300-175 exam content is regularly updated and has been checked for accuracy by our team of Cisco expert professionals.

2017 Cisco 300-175 (All 255 Q&As) exam dumps (PDF&VCE) from Lead2pass:

https://www.lead2pass.com/300-175.html [100% Exam Pass Guaranteed]